| Pioneer Natural Resourcesannounced 1 Aug 2023 |
Begin supplying power to operations from the wind farm due after leader left |
No record found31 Mar 2024 |
| Pioneer Natural Resourcesannounced 1 Aug 2023 |
Begin supplying power to operations from the wind farm due after leader left |
No record found31 Mar 2024 |
| Pioneer Natural Resourcesannounced 26 Apr 2023 |
Commence operations of a second localized sand mine |
Met30 Jun 2023 |
| Pioneer Natural Resourcesannounced 26 Apr 2023 |
Commence operations of a second localized sand mine |
Met30 Jun 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Transition 100% of completions fleets to electric or dual-fuel power |
Met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Place 500 to 530 wells on production |
Partly met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Place more than 100 wells with 15,000-foot laterals on production |
Met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Drill four Barnett/Woodford formation wells |
No record found31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Transition 100% of completions fleets to electric or dual-fuel power due after leader left |
Met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Place 500 to 530 wells on production due after leader left |
Partly met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Place more than 100 wells with 15,000-foot laterals on production due after leader left |
Met31 Dec 2023 |
| Pioneer Natural Resourcesannounced 22 Feb 2023 |
Drill four Barnett/Woodford formation wells due after leader left |
No record found31 Dec 2023 |
| Pioneer Natural Resourcesannounced 2 Aug 2022 |
End routine flaring due after leader left |
Being checked31 Dec 2025 |
| Pioneer Natural Resourcesannounced 2 Aug 2022 |
Reduce freshwater used in completions to 20% or less due after leader left |
Open31 Dec 2026 |
| Pioneer Natural Resourcesannounced 2 Aug 2022 |
End routine flaring due after leader left |
Being checked31 Dec 2025 |
| Pioneer Natural Resourcesannounced 2 Aug 2022 |
Reduce freshwater used in completions to 20% or less due after leader left |
Open31 Dec 2026 |
| Pioneer Natural Resourcesannounced 3 Nov 2021 |
Place 535 wells on production |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 3 Nov 2021 |
Place 535 wells on production |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 2 Aug 2021 |
Operate two simulfrac fleets |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 2 Aug 2021 |
Operate two simulfrac fleets |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 4 May 2021 |
Reduce operated rigs on DoublePoint acreage to 5 |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 4 May 2021 |
Place 470 to 510 wells on production |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 4 May 2021 |
Reduce operated rigs on DoublePoint acreage to 5 |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 4 May 2021 |
Place 470 to 510 wells on production |
No record found31 Dec 2021 |
| Pioneer Natural Resourcesannounced 23 Feb 2021 |
Place 385 to 415 wells on production |
Met31 Dec 2021 |
| Pioneer Natural Resourcesannounced 23 Feb 2021 |
Place 385 to 415 wells on production |
Met31 Dec 2021 |
| Pioneer Natural Resourcesannounced 20 Oct 2020 |
Publish a comprehensive 2020 Sustainability Report |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 20 Oct 2020 |
Close the acquisition of Parsley Energy |
Met31 Mar 2021 |
| Pioneer Natural Resourcesannounced 20 Oct 2020 |
Publish a comprehensive 2020 Sustainability Report |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 20 Oct 2020 |
Close the acquisition of Parsley Energy |
Met31 Mar 2021 |
| Pioneer Natural Resourcesannounced 6 May 2020 |
Operate an average of five to eight horizontal rigs in the Midland Basin |
No record found30 Jun 2020 |
| Pioneer Natural Resourcesannounced 6 May 2020 |
Operate an average of two to three frac fleets |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 6 May 2020 |
Operate an average of five to eight horizontal rigs in the Midland Basin |
No record found30 Jun 2020 |
| Pioneer Natural Resourcesannounced 6 May 2020 |
Operate an average of two to three frac fleets |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 19 Feb 2020 |
Complete the Gateway gas processing plant |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 19 Feb 2020 |
Place 345 to 375 wells on production |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 19 Feb 2020 |
Complete the Gateway gas processing plant |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 19 Feb 2020 |
Place 345 to 375 wells on production |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 4 Nov 2019 |
Decide on the long-term strategy for water infrastructure |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 4 Nov 2019 |
Decide on the long-term strategy for water infrastructure |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 6 Aug 2019 |
Commence operations of the Gulf Coast Express pipeline |
Met31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 Aug 2019 |
Complete the upgrade of the City of Midland wastewater treatment facility |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 6 Aug 2019 |
Commence operations of the Gulf Coast Express pipeline |
Met31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 Aug 2019 |
Complete the upgrade of the City of Midland wastewater treatment facility |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 6 May 2019 |
Conduct additional Wolfcamp D appraisal projects |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 May 2019 |
Divest gas processing midstream assets |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 May 2019 |
Conduct additional Wolfcamp D appraisal projects |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 May 2019 |
Divest gas processing midstream assets |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 13 Feb 2019 |
Increase recycled water usage to approximately 30% |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 13 Feb 2019 |
Place 265 to 290 wells on production |
Met31 Dec 2019 |
| Pioneer Natural Resourcesannounced 13 Feb 2019 |
Spud two additional Stackberry appraisal tests |
No record found31 Dec 2019 |
| Pioneer Natural Resourcesannounced 6 Nov 2018 |
Increase firm transportation capacity to the Gulf Coast |
No record found30 Nov 2018 |
| Pioneer Natural Resourcesannounced 6 Nov 2018 |
Place two additional multi-zone pads on production |
Met31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Nov 2018 |
Add two rigs to operations |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Nov 2018 |
Close sale of South Texas Sinor Nest oil assets |
Met31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Nov 2018 |
Deliver first volumes of sand under new supply agreement |
No record found31 Mar 2019 |
| Pioneer Natural Resourcesannounced 7 Aug 2018 |
Add two drilling rigs in the Permian Basin |
No record found31 Aug 2018 |
| Pioneer Natural Resourcesannounced 7 Aug 2018 |
Close the sale of the West Panhandle field |
Met30 Sep 2018 |
| Pioneer Natural Resourcesannounced 7 Aug 2018 |
Complete noncore asset divestiture process |
Partly met31 Dec 2018 |
| Pioneer Natural Resourcesannounced 7 Aug 2018 |
Add two drilling rigs in the Permian Basin |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 7 Aug 2018 |
Eliminate exposure to Midland oil pricing |
No record found31 Dec 2020 |
| Pioneer Natural Resourcesannounced 2 May 2018 |
Place approximately 45 Version 3.0+ completions on line |
No record found30 Jun 2018 |
| Pioneer Natural Resourcesannounced 2 May 2018 |
Increase export capacity to 150 MBOPD |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 2 May 2018 |
Appraise three additional Wolfcamp D wells |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 2 May 2018 |
Appraise 19 wells in the Middle Spraberry Shale, Jo Mill and Lower Spraberry Shale |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 9 Apr 2018 |
Begin sand offtake |
No record found30 Apr 2018 |
| Pioneer Natural Resourcesannounced 9 Apr 2018 |
Test approximately 45 Version 3.0+ completions |
Met30 Jun 2018 |
| Pioneer Natural Resourcesannounced 9 Apr 2018 |
Complete two new gas processing plants |
Not met30 Sep 2018 |
| Pioneer Natural Resourcesannounced 9 Apr 2018 |
Complete 65% of field-wide tank battery and saltwater disposal requirements |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Feb 2018 |
Complete 45 Version 3.0+ wells in the Permian Basin |
No record found30 Jun 2018 |
| Pioneer Natural Resourcesannounced 6 Feb 2018 |
Divest Eagle Ford Shale, South Texas, Raton and West Panhandle assets |
Partly met31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Feb 2018 |
Place 250 to 275 wells on production in the Permian Basin |
Met31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Feb 2018 |
Operate 20 horizontal rigs in the Permian Basin |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 6 Feb 2018 |
Drill seven Jo Mill appraisal wells |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 1 Nov 2017 |
Place seven wells on production in the Eagle Ford Shale |
No record found30 Nov 2017 |
| Pioneer Natural Resourcesannounced 1 Nov 2017 |
Drill additional Jo Mill wells |
No record found31 Dec 2018 |
| Pioneer Natural Resourcesannounced 12 Oct 2017 |
Complete facility modifications to enable West Panhandle field production to resume |
No record found30 Nov 2017 |
| Pioneer Natural Resourcesannounced 1 Aug 2017 |
Test a minimum of six additional 3.0+ wells |
No record found31 Dec 2017 |
| Pioneer Natural Resourcesannounced 3 May 2017 |
Export one million barrels of Permian oil to Europe |
Met30 Jun 2017 |
| Pioneer Natural Resourcesannounced 3 May 2017 |
Place six additional Jo Mill wells on production |
No record found31 Dec 2017 |
| Pioneer Natural Resourcesannounced 3 May 2017 |
Drill and complete new wells and complete drilled but uncompleted wells in the Eagle Ford Shale |
Met31 Dec 2017 |
| Pioneer Natural Resourcesannounced 7 Feb 2017 |
Export two Permian oil cargoes to Asia |
Not met31 Mar 2017 |
| Pioneer Natural Resourcesannounced 7 Feb 2017 |
Transfer West Panhandle gas processing operations to a third-party facility |
Late31 Mar 2017 |
| Pioneer Natural Resourcesannounced 1 Nov 2016 |
Restore Fain gas processing plant to full production rate |
Not met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 1 Nov 2016 |
Restore Fain gas processing plant to full production rate due after leader left |
Not met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Close the acquisition of Midland Basin acreage from Devon |
Met30 Sep 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Add one horizontal rig in the northern Spraberry/Wolfcamp |
Met30 Sep 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Add two horizontal rigs in the northern Spraberry/Wolfcamp |
Met31 Oct 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Place remaining Version 3.0 test wells on production |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Increase horizontal rig count in the northern Spraberry/Wolfcamp |
Met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Close the acquisition of Midland Basin acreage from Devon |
Met30 Sep 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Add one horizontal rig in the northern Spraberry/Wolfcamp |
Met30 Sep 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Add two horizontal rigs in the northern Spraberry/Wolfcamp |
Met31 Oct 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Place remaining Version 3.0 test wells on production due after leader left |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 28 Jul 2016 |
Increase horizontal rig count in the northern Spraberry/Wolfcamp due after leader left |
Met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Terminate two horizontal rigs in the southern Wolfcamp joint venture area |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Place approximately 60 horizontal wells on production |
Met30 Jun 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Drill 10 to 15 horizontal wells with lateral lengths greater than 10,000 feet |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Test enhanced completion designs on approximately 80 wells |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Terminate two horizontal rigs in the southern Wolfcamp joint venture area |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Place approximately 60 horizontal wells on production |
Met30 Jun 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Drill 10 to 15 horizontal wells with lateral lengths greater than 10,000 feet due after leader left |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 26 Apr 2016 |
Test enhanced completion designs on approximately 80 wells due after leader left |
No record found31 Dec 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Place 45 horizontal wells on production in the Spraberry/Wolfcamp area |
Met31 Mar 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Reduce northern Spraberry/Wolfcamp rig count to 12 rigs |
Not met31 Mar 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Complete oil export facilities along the Gulf Coast |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Reduce southern Wolfcamp joint venture rig count to zero |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Complete the sale of Eagle Ford Shale midstream business |
Met31 Jul 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Place 230 horizontal wells on production in the Spraberry/Wolfcamp area |
Met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Place 45 horizontal wells on production in the Spraberry/Wolfcamp area |
Met31 Mar 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Reduce northern Spraberry/Wolfcamp rig count to 12 rigs |
Not met31 Mar 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Complete oil export facilities along the Gulf Coast |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Reduce southern Wolfcamp joint venture rig count to zero |
No record found30 Jun 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Complete the sale of Eagle Ford Shale midstream business |
Met31 Jul 2016 |
| Pioneer Natural Resourcesannounced 10 Feb 2016 |
Place 230 horizontal wells on production in the Spraberry/Wolfcamp area due after leader left |
Met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 5 Jan 2016 |
Reduce horizontal rig count in the Eagle Ford Shale to four rigs |
Superseded31 Jan 2016 |
| Pioneer Natural Resourcesannounced 5 Jan 2016 |
Operate 18 horizontal rigs in the Spraberry/Wolfcamp area |
Not met31 Dec 2016 |
| Pioneer Natural Resourcesannounced 5 Jan 2016 |
Reduce horizontal rig count in the Eagle Ford Shale to four rigs |
Superseded31 Jan 2016 |
| Pioneer Natural Resourcesannounced 5 Jan 2016 |
Operate 18 horizontal rigs in the Spraberry/Wolfcamp area due after leader left |
Not met31 Dec 2016 |